The countertop rows are visible, but adding pieces, loading the benchmark and calculating require JavaScript. If those buttons do not respond, this file is being opened in a restricted preview. Open the app from a hosted HTTPS web address in Safari.
Supplier costs, labour, consumables and Primestone margin are hidden from the dealer.
| Description | Amount |
|---|
Supply, fabrication and installation of the selected quartz as quoted. Final dimensions are subject to site measurement. Cabinetry must be installed and level before final measurement. Plumbing and electrical reconnection are excluded unless specifically stated. Variations after final measurement may affect price. Quotation valid for 14 days.
Customer acceptance: ____________________ Date: ____________
| Magnolia supplier rate | R1,197/m² excl. VAT |
| Supplier delivery | R230/order |
| 2-person labour | R700/day |
| Consumables | R120/m² |
| Local transport | R150/job |
| Long distance | R3.80/km |
| Target gross margin | 35% |
| Minimum gross profit | R1,500 |
| VAT | 15% |
| 3220 × 630 | 2.0286 m² |
| 3220 × 925 | 2.9785 m² |
| 3220 × 1220 | 3.9284 m² |
| 3220 × 1850 | 5.9570 m² |
Auto mode tests the entered rectangular pieces against the actual 3220 mm sheet length and each purchasable width, including a 4 mm saw kerf, then selects the lowest-cost combination that physically fits. This is a quoting optimiser; final production cutting layout should still be checked before fabrication.
Private Primestone view — never shown on dealer or customer quotations.
| Cost component | Amount |
|---|
This is the dealer's markup portion, separate from Primestone's profit.
Actual cutting layout used by the sheet-selection calculation. Pieces are positioned on the selected 3220 mm sheets with a 4 mm saw kerf allowance.
| Standard polished edge | R20/lm |
| Undermount sink cut-out + polish | R250 fixed each — no margin/markup |
| Drainer grooves | R350/set |
| 100 mm upstand fabrication | R100/lm |
| Custom-height upstand | R150/m² |
| Splashback fabrication surcharge | R0 — material only |
| Mitred edge (40 mm or 60 mm) | R250/lm |
| Waterfall panel fabrication | R0/m² |
| Waterfall mitred joint | R80/lm |
| Existing top removal | R2,550 flat/job |
| Accommodation | R1,150/night |